Ships' hull launched in record time
Assignment: detail design of steel hull structure and piping engineering package for the technical spaces and accommodation of a 5,500m³ TSHD.
Challenge: only 8 months of free docking space in between 2 other projects.
It was an enormous ambitious planning from the yard. MULTI.engineering succeeded in meeting the very ambitious time schedule of shipyard.